Anne Arundel County
• MD 175 (Annapolis Road) between MD 713 (Ridge Road) and Disney Road – Paving/resurfacing – Single and double lane closures on MD 175 beginning Sunday at 8 p.m. through 5 a.m. Monday.

 

Baltimore County
• Double lane closure on northbound I-83 between Timonium Road and Shawan Road – Paving/resurfacing - Sunday night August 3 at 9 p.m.

• Bridge rehabilitation project for Park Heights Avenue Bridge over I-695 - Double lane closure on the Inner and Outer Loops of I-695 between Exit 20 (MD 140 – Reisterstown Road) and Exit 22 (Greenspring Avenue) – Bridge work – Sunday night August 3 beginning at 9 p.m.

• MD 26 Safety and resurfacing between I-695 and the Baltimore City line -Right lane closure on MD 26 (Liberty Road) in both directions between I-695 ramp to Kings James Circle on Sunday, August 3 between 9 p.m. and 5 a.m.

 

Carroll County
• Westbound MD 140 (Baltimore Boulevard) between Glenn Falls Road and MD 91 (Gamber Road/Emory Road) – Bridge work – Right lane closed Saturday, August 2, 6 a.m. to 2 p.m.
 

Frederick County
• MD 355 (Urbana Pike) at Grove Road in Frederick – Utility work –Temporary traffic stoppages on Sunday morning, August 3, between 5 a.m. and 8 a.m.

 

Howard County
• I-95 Northbound Bridge over the Patuxent River - alternating single lane closures from 5 a.m. to 12 p.m. on Sunday August 3 for bridge work.

• US 40 Westbound Bridge over I-70 - alternating single lane closures on I-70 eastbound on Wednesday and Thursday from 7 p.m. to 10 p.m. then alternating single lane closures on I-70 westbound from 11 p.m. to 2 a.m. for bridge work.

• Northbound I-95 between the Prince George’s County line and MD 216 (Scaggsville Road) – Paving/resurfacing – Single lane closures from 7 p.m. Friday to 5 a.m. Saturday.
 
• US 29 between Seneca Drive and Shaker Drive – Capacity improvement¬ – Northbound and southbound right lane closure Sunday, August 3 at 9 p.m. to Monday, August 4 at 5 a.m., to allow crews to place barrier wall.
 
• MD 32 (Sykesville Road) between Day Road and West Friendship Road – pavement markings – Lane closure with flagging, beginning at 8 p.m. Sunday, August 3, until 5 a.m. Monday, August 4.

 

Montgomery County
• MD 355 (Rockville Pike/Wisconsin Avenue) from  MD 191 (Bradley Lane) to  MD 187 (Old Georgetown Road)—Road resurfacing and utility conduit work—single and double lane closures, overnight, Sunday through Thursday, 10 p.m. to 5 a.m. and weekdays, 9 a.m.  to 3 p.m.

• Inner and Outer Loops of I-495 (Capital Beltway) between exit 28 (MD 650/New Hampshire Avenue) and exit 30 (US 29/Colesville Road)—Bridge demolition and construction—single and double lane closures, overnight, Sunday through Thursday, 8 p.m. to 5 a.m.

• MD 355 (Frederick Road) from King Farm Boulevard to Central Avenue—Road resurfacing and utility relocations—single lane closures, weekdays, 9 a.m. to 3 p.m. and double lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m.

• MD 586 (Viers Mill Road) from Randolph Road to Robindale Road—Water utility line replacements—single and double lane closures, overnight, Sunday through Saturday from 7 p.m. to 5 a.m.

• I-495 bridge ramp over Macarthur Boulevard - single right lane closure and partial ramp closure on I-495 IL from 5am to 11am on Sunday, August 3 for bridge work.

 

Prince George’s County
• Inner Loop of I-495 (Capital Beltway) between the ramp to Glenarden Parkway and US 50 (John Hanson Highway)—Median construction and barrier removal—single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m.

• Inner Loop of I-495 (Capital Beltway) from Arena Drive to D’Arcy Road (Central Avenue)—Guardrail removal/installation and road shoulder work—single lane closures, Friday, August 1 at 9 p.m. through Monday, August 4 at 5 a.m. 

• MD 202 (Largo Road) from Homestead Drive to Town Farm Road—Road resurfacing—single lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m.

• MD 5 (Branch Avenue) from St. Barnabas Road to I-95/I-495 (Capital Beltway)—Utility relocations—single lane closures, weekdays, 8 a.m. to 3 p.m.

 

Washington County
• On Monday August 4 and Tuesday, August 5 - I-70 Bridge over Licking Creek) single lane closure on I-70 between 9 a.m. and 2 p.m. for bridge work.

###