SHA WEEKEND LANE CLOSURES (08/22/2014 – 08/29/2014)

MDOT SHA Logo

MDOT SHA Logo

(This list is a snapshot of regional lane closures. It is not representative of all planned lane closures for this time period.  Click here to view the e-Road Ready 2014 report.  All work is weather permitting.)

Anne Arundel County

• Outer loop of I-695 (Baltimore Beltway) ramp to northbound MD 170 (Camp Meade Road)Concrete patching – Temporary ramp closure and detour from 9 p.m. Friday until 3 p.m. Sunday.

Baltimore County

• Inner loop I-695 at Ingleside Avenue Lane shift for road repair – Single and double lane closures from 5 p.m. Sunday until 5 a.m. Monday.

Howard County

• US 40 (Baltimore National Pike) at Bethany Lane BGE utility work – Intermittent total closures of US 40 between 6 a.m. and 9 a.m. Sunday.

 Northbound and southbound US 29 (Columbia Pike) between MD 175 and Seneca Drive Roadway widening – Single lane closures Sundays through Thursday from 9 p.m. until 5 a.m.

• I-95 between MD 216 (Scaggsville Road) and the Prince George’s County lineResurfacing – Single right lane closures from 7 p.m. Friday to 5 a.m. Saturday and again on Saturday from 7 p.m. until 5 a.m. Sunday.

Montgomery County

 MD 355 (Rockville Pike/Wisconsin Avenue) from MD 191 (Bradley Lane/Bradley Boulevard) to MD 187 (Old Georgetown Road) - Resurfacing – Single and double lane closures from 10 p.m. Sunday until 5 a.m. Monday.

Prince George’s County

• MD 4 (Pennsylvania Avenue) from Ritchie Marlboro Road to Dower House Road Resurfacing – Double lane closures in both directions Sundays through Thursdays from 9 p.m. to 5 a.m.
 

While SHA and its partners work hard to maintain safe traffic mobility in work zones, each driver needs to actively modify their driving style to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don't follow too closely. Safer Driving. Safer Work Zones. For everyone!

###