SHA PLANNED LANE CLOSURE UPDATE (07/24/2015 – 07/27/2015)

MDOT SHA Logo

MDOT SHA Logo

Harford County

• MD 7 (Philadelphia Road) Bridge over Bynum Run (between Abingdon Road and MD 136 (Calvary Road) Bridge replacement – Road closures starting 6 a.m. Saturday until August. US 40 (Pulaski Highway) is detour route. Click here for more information.

Montgomery County

• MD 97 (Georgia Avenue) at Randolph Road Interchange construction (traffic switch) – Multiple lane closures on MD 97 and Randolph Road (down to one lane in each direction) between 9 p.m. Friday until 5 a.m. Monday. Click here for more information.

Prince George’s County

• I-95/I-495 (Capital Beltway) at Ritchie Marlboro Road – Bridge repairs – Work will beginning Friday. Single lane closure at 9 p.m., double lane closures at 10 a.m. and triple lane closures at 11 a.m. These closures will be instituted Saturday and Sunday nights. All lanes will be opened by 5 a.m. each morning. Click here for more details.

The summer construction season is in high gear. For a statewide listing of most SHA projects, click here for e-Road Ready 2015.

In addition to this project, drivers may also encounter mobile or short-term work zones. Always expect the unexpected, pay extra close attention and drive slowly through any work zone. Whether it is a tree trimming operation or a bridge project, be aware when orange is there: Think Orange (the color of construction equipment and signs), stay alert and slow down. Everyone is at risk. In four out of five work zone-related crashes, it is the driver or passenger who is injured or killed.
###​

###