Anne Arundel County
• Southbound I-97 between I-695 and MD 100 – Concrete pavement patching – Two left lanes closed between 12:15 a.m. Saturday and 5 a.m. Monday. (Once concrete is poured, it takes time to come to strength so motorists may not see workers at times.)
Baltimore County
•
Outer loop of I-695 (Baltimore Beltway) ramp to northbound MD 41 (Perring Parkway) –
Pavement repairs associated with beltway widening – Ramp to be closed and detoured beginning at 10 p.m. Friday until 5 a.m. Monday.
Click here for more information.
• The Towson Roundabout – Line striping – Single lane closures between 10 p.m. Sunday and 5 a.m. Monday.
• MD 587 (Wilson Point Road) between MD 150 (Eastern Boulevard) and Strawberry Point Road – Resurfacing – Single lane closures between 9 p.m. Sunday and 5 a.m. Monday.
Caroline/Talbot County line
• MD 331 (Dover Road) Bridge over the Choptank River (Dover Bridge) – Bridge replacement – Single lane closure on Saturday between 9 a.m. to 7 p.m.
Dorchester County
• Eastbound US 50 between Linkwood Drive and Old Ocean Gateway Road - Resurfacing – Single lane closures on Saturday between 7 a.m. to 5 p.m.
Frederick County
• MD 464 (Point of Rocks Road) between US 15 and MD 17 (Souder Road) – Pavement repair – Single lane closure with flagging operation beginning 9 p.m. Sunday until 5 a.m. Monday.
• Southbound I-270 between Jefferson Street and MD 85 (Buckeystown Pike) – Pavement repair – Single lane closure on 9 p.m. beginning Sunday until 5 a.m. Monday
Howard County
• Southbound I-95 between the Baltimore County line and MD 100 – Bridge approach paving – Single and double lane closures beginning at 8 p.m. Sunday until 5 a.m. Monday.
• MD 32 at Day Road – Paving– Single lane closure with flagging on Saturday between 7 a.m. and 5 p.m.
• MD 32 between I-70 and MD 108 – Pavement preservation treatment – Single lane closures (mobile operation) on Saturday between 7 a.m. and 5 p.m.
Prince George’s County
• Inner loop of I-495 (Capital Beltway) between I-95 and MD 212 (Powder Mill Road) – Guardrail repairs – Single left lane closure Saturday between 7 a.m. and 4 p.m.
• Eastbound US 50 (John Hansen Highway) between I-95/I-495 and MD 197 (Laurel Bowie Road) – Pavement patching - Single and double lane closures beginning at 9 p.m. Friday until 5 a.m. Monday.
Queen Anne’s County
•
Eastbound and Westbound US 50 ramps at Castle Marina Road/MD 552 (Dominion Road)/Piney Creek Road –
Ramp resurfacing – Expect temporary ramp closures with detours Saturday between 8 a.m. and 5 p.m. (Note: Inspectors will be vigilant for delays on mainline US 50 and will adjust accordingly to minimize major delays.)
Click here for a listing of interchanges that will be resurfaced.
• Southbound US 301 (Blue Star Memorial Highway) at MD 213 (Centreville Road) – Interchange ramp resurfacing – Full ramp closures with detours Saturday between 8 a.m. and 4 p.m.