SHA PLANNED LANE CLOSURE UPDATE (11/25/2016 – 11/30/2016)

MDOT SHA Logo

MDOT SHA Logo

SHA has suspended all non-emergency lane closures until 9 p.m. Monday, November 28.
 
(All Work is Weather Permitting)

Total Closures with Detours
 
Baltimore County
 
• MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road – Roundabout construction – Mt. Vista Road leg of intersection is closed and detoured.  The detour is Sunshine Avenue to US 1 (Belair Road.) 

Cecil County

• MD 222 Bridge over Rock Run – Bridge replacement – Total closure and detour for ten weeks.  Project will be completed early November.  Road to reopen by early January.

Montgomery County

• MD 195 (Carroll Avenue) between Jefferson Avenue and Flower Avenue (MD 195 Bridge over Sligo Creek and Parkway) - Bridge rehabilitation – Bridge to closed and traffic detoured for one year. 

Wicomico County

• MD 54 (Delmar Road) Bridge over Mockingbird Creek - Bridge replacement – Bridge closed and traffic detoured for ten weeks.  Bridge should reopen mid-December.

• MD 349 (Nanticoke Road) Bridge over Windsor Creek - Bridge replacement – Bridge to close and traffic to be detoured for ten weeks.  Bridge should reopen early-December.

A look ahead at next week

Anne Arundel County
 
• I-895 (Harbor Tunnel Thruway) Bridge over the Patapsco River (Patapsco Flats) (MDTA project) – Bridge rehabilitation – Reduced lanes. 

• Inner loop of I-695 (Baltimore Beltway) ramp to MD 648 (Baltimore-Annapolis Boulevard) – Concrete patching – Total ramp closure and detour Sundays through Thursdays between 9 p.m. and 5 a.m.
 
Baltimore County
 
• Outer loop I-695 at the Bridge over Northeast Creek (prior to MD 702) – Bridge rehabilitation – Nighttime outer loop closure and detour between 10 p.m. and 5 a.m. Sundays through Fridays.  SHA will direct outer loop traffic to MD 150 (Eastern Avenue) to MD 702 and back to the outer loop.  Approximately two weeks remaining.

Caroline, Queen Anne’s and Talbot counties

• MD 404 between US 50 and the Town of Denton – Dualization – Single daytime and night time lane closures.

Cecil County

• MD 273 (Telegraph Road) at Appleton Road – Roundabout construction – Single lane closures with a flagging operation 9 a.m. until 3 p.m.

• Westbound US 40 (Pulaski Highway) between MD 222 (Perryville Road) and MD 272 (North East Road) – Resurfacing – Single lane and shoulder closures from 8 p.m. until 5 a.m. Sundays through Thursdays.

Frederick County

• US 40 Alternate (Main Street) between Ivy Hill Drive and Middletown Parkway – Streetscape project – Single lane closures with a flagging operation Mondays through Fridays between 9 a.m. and 3 p.m.

Howard County
 
• MD 27 (Ridge Road) between the Frederick County line and the Montgomery County line – Resurfacing - Single lane closures with flagging operation Mondays through Fridays between 9 9 a.m. and 3 p.m. (Hours moved to day shift due to nighttime temperature drop.)

Montgomery County

• MD 355 (Rockville Pike) from Templeton Place to Hubbard Drive – Resurfacing – Single and double lane closures Sundays through Thursdays between 7 a.m. and 5 a.m.

• MD 117 (Clopper Road) from Longdraft Street to I-270 – Resurfacing – Single lane closures Sundays through Thursdays from 9 p.m. until 5 a.m.

Prince George’s County

• MD 201 (Kenilworth Avenue) between I-95/I-495 and Cherrywood Lane - Resurfacing – Single and double lane closures Mondays through Fridays between 9 a.m. and 3 p.m.
 
• Westbound US 50 (John Hanson Highway) between the Anne Arundel County line and Lottsford Vista Road – Pavement patching – Double lane closures Sundays through Thursdays between 8 p.m. and 5 a.m.
 

Wicomico County
 
• US 13 (Salisbury Bypass) near the US 50 interchange – Traffic pattern change/bidirectional traffic using median for bridge deck project – Click here for information and schedule of project.
 
Worcester County
 
• MD 90 (Ocean City Expressway) between US 50 (Ocean Gateway) and MD 113 (Worcester Highway) – Resurfacing – Total closure and detour using US 50 on December 5-9 from 7 a.m. until 5 p.m.
 

###