MDOT SHA MAJOR PLANNED MAJOR WEEKEND LANE CLOSURE UPDATE (08/18/2017 – 08/21/2017)

MDOT SHA Logo

MDOT SHA Logo

For A listing of ALL Major MDOT SHA Projects spring through fall, click here for e-Road Ready 2017, an interactive map of major MDOT SHA projects.

Major Weekend Lane Closures

Anne Arundel County

US 50 on the Severn River Bridge BGE utility work – Single lane closures Sundays through Thursday between 9 p.m. and 5 a.m.
 
Baltimore County

I-95 between US 1 and the Baltimore City/County line Resurfacing/pavement patching/milling – Single and double lane closures Sundays through Thursday between 9 p.m. and 5 a.m.

Crosby Road Bridge over I-695 (Baltimore Beltway)Routine bridge inspection - Single lane closures Saturday between 4 a.m. and 12 noon.

Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m.

Howard County

US 1 (Washington Boulevard) between Meadowridge Road and Kit Kat Road Resurfacing – Single lane closures Sundays through Friday mornings between 8 p.m. and 5 a.m. each morning.

Montgomery County

Outer loop of I-495 between Seminary Road and the I-270 spur Resurfacing project - Single and double lane closures between 9 p.m. Sunday until 5 a.m. Monday.

Southbound MD 355 (Wisconsin Avenue) between Norfolk Avenue and Bethesda Avenue Building demolition/hauling operation by private contractor – Southbound MD 355 to be closed, as well as the right lane on northbound MD 355, beginning at 11 p.m. Saturday until 6 a.m. Sunday.

Inner and outer loop of I-495 (Capital Beltway) Bridge over MD 185 (Connecticut Avenue) - Bridge cleaning and painting - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.

Seminary Road Bridge over I-495 Routine bridge inspection - Single lane closures Saturday between 4 a.m. and 12 noon.

Grosvenor Road Bridge over I-270 Routine bridge inspection - Double lane closures Sunday between 4 a.m. and 12 noon.

MD 97 (Georgia Avenue) at MD 28 (Norbeck Road)Intersection improvement project/utility relocation - Single lane closures Mondays through Fridays between 9 a.m. and 4 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.

MD 187 (Old Georgetown Road) at Lincoln Drive Utility work/private - Single and double lane closures in each direction Saturdays from 9 a.m. to 9 p.m. through September 16.

MD 187 (Old Georgetown Road) between Johnson Avenue and Sonoma Road - Sidewalk ramp construction, utility work and concrete bus pad installations - Single and double lane closures Mondays through Fridays from 10 a.m. until 8 p.m. and weekends (for concrete work) Fridays beginning at 9 p.m. until 5 a.m. Mondays.

MD 355 (Rockville Pike) between Wilson Drive and Woodmont Avenue - Montgomery County Crossing Project clearing and curb work - Single and double lane closures in each direction beginning Friday at 9 p.m. until 5 a.m. Monday.

US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue)WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Weekend lane closures are possible between 9 a.m. and 9 p.m.

Prince George’s County

Westbound US 50 (John Hanson Highway) between the Anne Arundel County Line and Lottsford Vista Road - Resurfacing – Single, double and triple lane closures Fridays through Mondays between 10 p.m. and 5 a.m. and double lane closures Sundays through Thursdays between 10 p.m. and 5 a.m.
 
• Inner loop of I-495 (southbound I-95) Bridge over MD 450 (Annapolis Road) - Bridge deck repairs - Single MD 450 lane closures Mondays through Saturdays between 9 a.m. and 3 p.m. and double I-495/I-95 lane closures Sundays through Thursdays between 9 p.m. and 5 a.m. through the end of August.
 
• US 1 (Baltimore Avenue) between Guilford Road and Rossborough Lane Pedestrian/traffic signal system upgrades – Crews will be working on the side streets (no expected closures on US 1) Saturday between 7 a.m. and 5 p.m.

MD 210 (Indian Head Highway) between I-295/I-495 ramps and Palmer Road - Interchange construction - Single lane closures Sunday nights to Friday mornings between 8 p.m. and 5 a.m. and Mondays through Saturdays between 9 a.m. to 3 p.m.
 
MD 337 (Allentown Road) between Forestville Road and Suitland Road - Storm water infrastructure work -  Single lane closures Mondays through Saturdays between 9 a.m. and 3 p.m. and Sundays through Friday mornings between 8 p.m. and 5 a.m.

Inner and outer loops (north and southbound I-95) of I-95/I-495 (Capital Beltway) between MD 337 (Allentown Road) and MD 4 (Pennsylvania Avenue)Shoulder construction/Interchange work – Single and double lane closure in each direction Sundays through Fridays from 7 p.m. until to 5:00 a.m.
 
Long-Term Closures
 
Baltimore County
 
MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road Roundabout construction –Glen Arm Road is closed and detoured. 
 
Charles County
 
MD 234 (Budds Creek Road) Bridge over Gilbert Swamp RunBridge replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  
 
Dorchester County
 
MD 14 (Rhodesdale-Eldorado Road) Bridge over Marshyhope Creek (Brookview Bridge) Cleaning/Painting/general repairs- Single lane closures and flagging across the bridge from sunrise to sunset.
 
Frederick County

MD 194 (Woodsboro Pike) Bridge over Little Pipe Creek (at the Carroll County line)Bridge replacement project –Bridge closed for 10 weeks for expedited replacement on June 17 until September 4, 2017.
 
Wicomico County
 
Southbound US 13 ramp/bridge to the eastbound/southbound Salisbury Bypass Bridge/ramp rehabilitation – Total closure and detour until early September to expedite the work.
 
A look ahead at next week

Baltimore County
 
Southbound MD 129 (Park Heights Avenue) between MD 133 (Old Court Road) and Baltimore City line (BGE project)BGE Gas line replacement project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.
 
Caroline/Queen Anne’s/Talbot counties

MD 404 (Queen Anne Highway/Shore Highway) between US 50 (Ocean Gateway) and MD 309 (Starr Road) and MD 480 (Ridgely Road) and the Denton Bypass Highway widening – Single lane closures with flagging operations possible in each direction of MD 404 12 noon Mondays until 12 noon Fridays. For an updated list of lane closures on this project, click here.
 
Montgomery County

MD 28 (Darnestown Road) between MD 124 (Quince Orchard Road) and Argosy Road - Sidewalk construction/part of safety/resurfacing project - Single eastbound lane closures Mondays through Fridays from 10 a.m. until 4 p.m.

MD 97 (Georgia Avenue) at Randolph Road - Interchange construction - Single lane closures in both directions of both roads, Mondays through Saturdays between 9 a.m. and 3 p.m. and Sundays through Friday mornings between 10 p.m. and 5 a.m.
 
• Northbound MD 355 (Frederick Road) at Chestnut Street - Water utility work - Single left lane closure – Wednesday and Thursday (8/23 and 8/24) between 9 p.m. and 5 a.m.
 

###