For A listing of ALL Major MDOT SHA Projects spring through fall, click here for e-Road Ready 2017, an interactive map of major MDOT SHA projects.

Major Weekend Lane Closures

Anne Arundel County

• US 50 on the Severn River Bridge – Lane widening project – Single lane closures Sundays through Thursday between 9 p.m. and 5 a.m.

Baltimore County

• I-95 between US 1 and the Baltimore City/County line – Resurfacing/pavement patching/milling – Single and double lane closures Sundays through Thursday between 9 p.m. and 5 a.m.

• MD 7 (Philadelphia Road) between Golden Ring Road and Rossville Boulevard – Concrete work (bus pad installation) – Single lane closure beginning Friday at 8 p.m. until 5 a.m. Monday, September 11. Concrete takes time to achieve the necessary strength to open the lane so motorists may not see crews mid-weekend as this process is occurring.
 
Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks – Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m.
 
Harford County

• MD 132 (West Bel Air Avenue) between MD 462 (Paradise Road) and US 40 (Philadelphia Boulevard) – Pavement repair (patching) – Single lane closures Sunday nights through Friday mornings from 9 p.m. until 5 a.m.
 
Montgomery County

•  Outer loop of I-495 between Seminary Road and the I-270 spur – Resurfacing - Single and double lane closures between 9 p.m. Sunday until 5 a.m. Monday.
 
•  I-270 between MD 121 (Clarksburg Pike) and the Frederick County line – Resurfacing - Single and shoulder closures Sunday nights until Friday mornings between 9 p.m. and 5 a.m.
 
• Inner and outer loop of I-495 (Capital Beltway) Bridge over MD 185 (Connecticut Avenue) - Bridge cleaning and painting - Single lane closures Mondays through Fridays between 9 a.m. and 3 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.
 
• MD 97 (Georgia Avenue) at MD 28 (Norbeck Road) – Intersection improvement project/utility relocation - Single lane closures Mondays through Fridays between 9 a.m. and 4 p.m. and Sundays through Thursdays between 9 p.m. and 5 a.m.
 
• MD 187 (Old Georgetown Road) at Lincoln Drive – Utility work/private - Single and double lane closures in each direction Saturdays from 9 a.m. to 9 p.m. through September 16.
 
• MD 97 (Georgia Avenue) between White Drive and MD 390 (16th street) - Resurfacing. Single and double lane closures, overnight, Sunday through Thursday, 9 p.m. to 5 a.m.

• MD 187 (Old Georgetown Road) between Johnson Avenue and Sonoma Road - Sidewalk ramp construction, utility work and concrete bus pad installations - Single and double lane closures Mondays through Fridays from 10 a.m. until 8 p.m. and weekends (for concrete work) Fridays beginning at 9 p.m. until 5 a.m. Mondays.

• MD 355 (Rockville Pike) between Wilson Drive and Woodmont Avenue - Montgomery County Crossing Project - Single and double lane closures in each direction beginning Friday at 9 p.m. until 5 a.m. Monday.

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) -  WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Weekend lane closures are possible between 9 a.m. and 9 p.m.
 
Prince George’s County
 
•  MD 5 (Branch Avenue) between Suitland Parkway and Curtis Drive -  Resurfacing - Single and double lane closures weekdays between 9 a.m. and 3 p.m. and Sunday nights through Friday mornings between 8 p.m. and 5 a.m.
 
• Westbound US 50 (John Hanson Highway) between the Anne Arundel County Line and Lottsford Vista Road - Resurfacing – Single, double and triple lane closures Fridays through Mondays between 10 p.m. and 5 a.m. and double lane closures Sundays through Thursdays between 10 p.m. and 5 a.m.
 
• MD 197 (Laurel Bowie Road) between MD 450 (Annapolis Road) and US 50 – Resurfacing - Single lane closures Sunday nights until Friday mornings between 9 p.m. until to 5 a.m.
 
• I-95/I-495 (Capital Beltway) between MD 337 (Allentown Road) and MD 4 (Pennsylvania Avenue) – Shoulder construction/Interchange work – Single and double lane closure in each direction Sundays through Fridays from 7 p.m. until to 5:00 a.m.
 
• MD 210 (Indian Head Highway) between I-295/I-495 ramps and Palmer Road - Interchange construction - Single lane closures Sunday nights to Friday mornings between 8 p.m. and 5 a.m. and Mondays through Saturdays between 9 a.m. to 3 p.m.
 
Long-Term Closures
 
Baltimore County
 
• MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road – Roundabout construction –Glen Arm Road is closed and detoured.
 
Cecil County
 
• MD 281 (Red Hill Road) at Muddy Lane – Roundabout construction –MD 281 and Muddy Lane are closed and detoured.
 
Charles County
 
• MD 234 (Budds Creek Road) Bridge over Gilbert Swamp Run – Bridge replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  
 
Dorchester County
 
• MD 14 (Rhodesdale-Eldorado Road) Bridge over Marshyhope Creek (Brookview Bridge) Cleaning/Painting/general repairs - Single lane closures and flagging across the bridge from sunrise to sunset.
 
Wicomico County
 
• Southbound US 13 ramp/bridge to the eastbound/southbound Salisbury Bypass – Bridge/ramp rehabilitation – Total closure and detour until late-September to expedite the work.
 
A look ahead at major work next week
 
Anne Arundel County
 
• Southbound MD 3 (Crain Highway) (Median) between Waugh Chapel Road and MD 175 (Millersville Road) (BGE project) – BGE electric transmission line project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.
 
Baltimore County
 
• Southbound MD 129 (Park Heights Avenue) between MD 133 (Old Court Road) and Baltimore City line (BGE project) – BGE Gas line replacement project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.
 
Caroline/Queen Anne’s/Talbot counties

• MD 404 (Queen Anne Highway/Shore Highway) between US 50 (Ocean Gateway) and MD 309 (Starr Road) and MD 480 (Ridgely Road) and the Denton Bypass – Highway widening – Single lane closures with flagging operations possible in each direction of MD 404 12 noon Mondays until 12 noon Fridays.
 
Washington County
 
• I-81 between MD 63/MD 68 and the bridge over the Potomac River – Highway and bridge widening – Occasional single lane closures and flagging across the bridge from sunrise to sunset.
 
• I-70 between Ashton Road and Conococheague Creek Bridge – Resurfacing – Single lane and shoulder closures Sunday nights through Friday mornings from 9 p.m. to 5 a.m.

• Westbound I-70 between MD 615 and the Tonoloway Creek Bridge – Resurfacing – Single lane and shoulder closures Sunday nights through Friday mornings from 9 p.m. to 5 a.m.
 

 

###