HIGH-IMPACT EVENT

MD 97 (Georgia Avenue) between MD 410 (East West Highway) and US 29 (Colesville Road) - Montgomery County Thanksgiving Parade – MD 97 to CLOSE and be detoured on Saturday from 6 a.m. to 1 p.m. Use Colesville Road, East West Highway and MD 193 (University Boulevard) as alternates. For more information, click link -  http://www.silverspringdowntown.com/montgomery-county-thanksgiving-parade.
 
Major Weekend Lane Closures

Anne Arundel County

• US 50 on the Severn River Bridge – Lane widening project – Single lane closures Sundays through Thursday between 7 p.m. and 5 a.m.

Frederick County
 
• MD 26 (Liberty Road) between US 15 and MD 194 (Woodsboro Road) – Ditch repairs/Shoulder work – Single lane closures guided by a flagging operation Saturday between 4 a.m. and 9 a.m. new

• MD 194 (Francis Scott Key Highway) between MD 550 (Woodsboro Road) and the Carroll County line – Resurfacing – Single lane closures guided by a flagging operation, Sunday nights until Friday mornings between 9 p.m. and 5 a.m.

• Eastbound I-70 at Harmony Road – Bridge deck repairs – Single lane closure beginning at 8 p.m. Sunday until 5 a.m. Monday.

Howard County

• MD 32 between US 29 (Columbia Pike) and MD 108 (Clarksville Pike) – Resurfacing – Single lane closure Saturday and Sunday between 7 a.m. and 3 p.m.  new

Montgomery County

• Inner and outer loop of I-495 (Capital Beltway) between MD 97 (Georgia Avenue) and MD 185 (Connecticut Avenue) – Seminary Road bridge rehabilitation project – Occasional single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. new

• Outer loop of I-495 (Capital Beltway) at southbound I-270 and southbound I-270 spur to the outer loop of I-495 - Resurfacing and pavement marking - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. through late-fall.

• MD 193 (University Boulevard) between I-495 (Capital Beltway) and MD 320 (Piney Branch Road) – Resurfacing - Single and double lane closures Sundays through Friday mornings between 9 p.m. and 5 a.m., as well as Mondays through Fridays between 9 a.m. and 3 p.m.

• HIGH-IMPACT - Southbound MD 355 (Wisconsin Avenue) between Cordell Avenue and Battery Lane - Private commercial crane operation - Triple lane closure with detour and sidewalk closures on Sunday between 9 a.m. until 9 p.m. new

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) -  WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Weekend lane closures are possible between 9 a.m. and 9 p.m.

• Southbound US 29 (Colesville Road) at Spring Street - Private/commercial construction - Single and double lane closures on Saturday, November 18th between 9 a.m. and 5 p.m. new
 
Prince George’s County

• Northbound I-95 (outer loop of I-495) at Ritchie Marlboro Road – Bridge joint repair – Double right lane closure beginning at 9 p.m. Sunday until 5 a.m. Monday. Same hours Monday into Tuesday. new

• Temple Hill Road Bridge over I-95/I-495 (Capital Beltway) – Bridge deck repairs - Single, double and triple left lane closures on I-95/I-495 and single lane closures on Temple Hill Road -Sunday nights through Friday mornings between 8 p.m. and 5 a.m. through late-November.

• MD 381 (Brandywine Road Road) between MD 5 (Branch Avenue) and US 301 – Utility work - Single lane closures guided by a flagging operation on Sunday nights through Friday mornings between 8 p.m. and 6 a.m. new

• Westbound US 50 (Hansen Highway) between the Anne Arundel County Line and Lottsford Vista Road - Resurfacing - Single lane closures between 10 a.m. and 10 p.m., through late-fall.

• US 1 (Baltimore Avenue) between Hollywood Road and Lackawanna Street - Private/commercial water utility work - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. to 5 a.m. through late-fall.
 
Long-Term Closures
 
Baltimore County
 
• MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road – Roundabout construction –Glen Arm Road is closed and detoured. Glen Arm Road is open to traffic. Mt. Vista Road is temporarily closed and detoured for the next two weeks to complete concrete work.

Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks – Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m. until project completion, fall 2019/winter 2020.

Charles County

• MD 234 (Budds Creek Road) Bridge over Gilbert Swamp Run – Bridge replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  

• MD 6 (Charles Street) Bridge over Zekiah Swamp – Bridge deck replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  

A look ahead at next week

Thanksgiving Lane Closure Restrictions

Tuesday, Nov. 21, no interstate lane closures after 3 p.m.
Wednesday, Nov. 22 until 9 a.m. on Monday 27 – No lane closures
 
Anne Arundel County

• Southbound MD 3 (Crain Highway) (Median) between Waugh Chapel Road and MD 175 (Millersville Road) (BGE project) – BGE electric transmission line project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.

Baltimore County

• I-83 (Baltimore-Harrisburg Expressway) at MD 137 (Mt. Carmel Road) – Bridge replacement project - Single lane and shoulder closures Mondays through Fridays between 9 a.m. and 3 p.m.

Caroline/Queen Anne’s/Talbot counties
 
• MD 404 (Queen Anne Highway/Shore Highway) between US 50 (Ocean Gateway) and MD 309 (Starr Road) and MD 480 (Ridgely Road) and the Denton Bypass – Highway widening – Single lane closures with flagging operations possible in each direction of MD 404 12 noon Mondays until 12 noon Fridays.
 
Howard County
 
• Northbound I-95 ramp to northbound I-895 – Sound wall construction – Ramp to be closed and detoured Sundays through Friday mornings between 9 p.m. and 5 a.m. until Late-December.
 
Washington County
 
• I-81 at the MD 63/MD 68 Bridge – Highway and bridge widening – Single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m.
 
• I-70 between Tonoloway Creek Bridge and MD 615 (Heavenly Acres Ridge Road) – Mobile rumble strip operations Monday night into Tuesday morning between 9 p.m. and 5 a.m. new
 
• US 40 (National Pike) between Redwood Circle and Landis Spring Creek – Resurfacing – Single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. new
 
 

 
 

###