MDOT SHA MAJOR PLANNED MAJOR WEEKEND LANE CLOSURE UPDATE (01/11/19 – 01/14/19)

MDOT SHA Logo

MDOT SHA Logo

All Work is Weather Dependent

Real-Time travel conditions and live traffic cameras are available - https://chart.maryland.gov/.

HIGH-IMPACT ALERTS

Prince George’s County

• HIGH-IMPACT – Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202. This will last until fall 2021. Traffic signals retimed on MD 202 and MD 214 to accommodate extra volume. RAMP CLOSED on 1/10/2019

Major Weekend Lane Closures

Winter weather expected. Check out MDOT SHA’s STORM (Statewide Transportation Operations Resource Map) -

Long-Term Closures

Anne Arundel County

• HIGH IMPACT - MD 175 (Annapolis Road/Jessup Road) at MD 295 (Baltimore-Washington Parkway) – Lane reduction and ramp closure and detour for utility relocation – Beginning January 7, one lane in each direction on MD 175 between National Business Parkway and MD 295. Ramps closure and detour of the southbound MD 295 ramp to westbound MD 175. Traffic to use the loop ramp to access westbound MD 175 from MD 295 new

• Northbound I-895 Bridge over the Patapsco Flats (Between MD 295 and the I-97/MD spur) – Bridge rehabilitation – (MDTA project) 24/7 right lane closure until summer 2019.

Baltimore City

• HIGH-IMPACT - (MDTA Project) - I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit. – Bridge rehabilitation project – Northbound I-895 to close on November 27 and two-way traffic using southbound I-895. Use I-95 (Fort McHenry Tunnel) or I-695 (Francis Scott Key Bridge) as alternate routes. Project to last until 2021.

Baltimore County

• Outer loop of I-695 (Baltimore Beltway) ramp to Edmonson Avenue – Ramp closure for widening project – Motorists will be guided to I-695/MD 144 (Frederick Road) interchange and back to the inner loop I-695 to Edmonson Avenue Deerco Road to the I-83/Timonium Road interchange. In approximately three weeks, the Edmonson Avenue ramp to the outer loop I-695 will also close. Local detours.

• Eastbound Padonia Road ramp to northbound I-83 – Ramp closure for bridge replacement project – Motorists will be guided to Deerco Road to the I-83/Timonium Road interchange.

Frederick County

• Eastbound US 40 Alternate (Old National Pike) between Fern Lane and Ridge Road – Roadside slope repair – Right truck “climbing” lane and shoulder closed until spring 2019.

Prince George’s County

• HIGH-IMPACT – Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202.

• HIGH-IMPACT – Eastbound Ritchie Marlboro Road (MD 980) at MD 4 (Pennsylvania Avenue) - Slope and drainage repair – Eastbound Ritchie Marlboro Road to be closed and detoured for up to 60 days starting Monday, January 7. Motorists to be directed to MD 717 (Water Street).

• US 301 (Crain Highway) between Frank Tippett Road and Trumps Hill Road - Gas pipeline construction and installation (Washington Gas project) – Single right lane closure through spring 2019.

Somerset/Worcester County line

• US 13 (Ocean Highway) northbound over Pocomoke River at the Worcester/Somerset county line – Bridge work – Northbound US 13 bridge over Pocomoke River has been reduced to one 12-foot lane for bridge work through the late-fall.

Wicomico County

• MD 349 (Nanticoke Road) Rockawalkin Road – Washout/major road repair – MD 349 is closed and detoured until early 2019.
 
MAJOR Closures for Next Week

Anne Arundel County

• MD 214 (Central Avenue) at MD 468 (Muddy Creek Road) – Pipe repair – Single lane closures between 9 a.m. and 3 p.m. Mondays through Fridays until mid-January.

Frederick County

• MD 28 (Dickerson Road) Bridge over the Monocacy River – Bridge rehabilitation project – Single lane closures guided by flaggers Mondays through Fridays between 9 a.m. and 3 p.m.

Montgomery County

• Northbound I-270 at MD 109 (Old Hundred Road) – Paving/line striping – On northbound I-270 - Single lane closures Mondays through Fridays between 9 a.m. and 11 a.m.

• MD 97 (Georgia Avenue) between north of Goldmine Road and south of Holiday Drive - Bypass construction – Single lane closures Mondays through Fridays between 8 a.m. and 3 p.m.

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) - WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Single lane closures Saturday between 9 a.m. and 5 p.m.

Washington County

• I-81 between the Potomac River Bridge (West Virginia line) and MD 68/MD 63 (Lappans Road) – Highway widening project – Left lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. There may be occasional, brief total closures to move equipment and material into place between 2 a.m. and 4 a.m.

On the Horizon

Baltimore County

• Outer loop of I-695 (Baltimore Beltway) ramp to MD 542 (Loch Raven Boulevard)/Cromwell Bridge Road – Pipe crossing for slope repair/stream restoration – The ramp closure will begin Friday, January 18 at 11 p.m., and end by 5 a.m. Monday, January 21.

Kent County

• MD 213 (Church Hill Road) Bridge over the Chester River – Routine drawbridge maintenance – Temporary test openings and closings lasting no longer than normal operations on January 21 between 9 a.m. and 3 p.m.

###