MDOT SHA Logo (All work is weather permitting. The blue text indicates a hyperlink to a map.) Baltimore County • I-695 (Baltimore Beltway) at MD 144 (Frederick Road). Bridge replacement and interchange reconstruction. Single and double lane closures possible Sunday through Thursday nights, March 10-March14 between 10 p.m. and 5 a.m. • Middletown Road Bridge over I-83 (Baltimore-Harrisburg Expressway). Bridge rehabilitation project. Single lane closures possible daily on north and southbound I-83 from March 11 through March 15, 9 a.m. until 3 p.m. •I-695 over northbound I-83 – Routine bridge inspection - alternating single right and left lane closures on northbound I-83, 5 a.m. until noon on Sunday, March 10. Howard County • Eastbound I-70 prior to US 29 (Columbia Pike) – Overhead sign structure installation – intermittent single lane closures Monday through Friday from 9 a.m. until 3 p.m. Montgomery County • Northbound I-270 between Germantown (MD 118) and Gaithersburg (MD 117). Guardrail installation. Work will occur Monday through Wednesday, March 11 to March 13. Northbound lane closures may occur between 7 a.m. and 3 p.m. and southbound lane closures from 9 a.m. until 5 p.m. There may be temporary overnight ramp closures with posted detours. • Muddy Branch Road over I-270- Routine bridge inspection - alternating double right and left lane closures on Saturday, March 9 along southbound I-270 from 5 a.m. until noon. Prince George’s County • MD 212 (Riggs Road) over the outer loop of I-495 – Routine bridge inspection - alternating double right and left lane closures on the outer loop of I-495 on Saturday, March 9 from 5 a.m. until 9 a.m. Queen Anne’s County • Westbound US 50 over US 301 – Bridge rehabilitation project- right lane closed on westbound US 50. ###