SHA PLANNED LANE CLOSURE UPDATE (12/06/13 TO 12/13/13)

MDOT SHA Logo

MDOT SHA Logo

 
Baltimore County

• Inner loop I-695 (Baltimore Beltway) ramp to MD 144 (Fredrick Road) Bridge replacement – temporary ramp closure. Click here for details.

• Southbound I-95 near Caton AvenuePavement repair – Single and double lane closures from 9 a.m. Saturday until 2 p.m. Sunday.

 Southbound and northbound I-95 at the Baltimore/Howard County line (bridge over the Patapsco River) – Pavement repair - Double lane closures from 10 p.m. Sunday until 5 a.m. Monday.

Montgomery County

 MD 650 (New Hampshire Avenue) at Sligo Creek Parkway- Bridge deck rehabilitation – possible single and double lane closures Monday through Friday between 5 a.m. and 3 p.m., as well as overnight Sunday through Saturday from 7 p.m. to  5 a.m. Click here for more information.

Prince George’s County

• Inner Loop and Outer Loops I-95/I-495 (Capital Beltway) from Glenarden Parkway to US 50 (John Hanson Highway) - Concrete barrier installation - Single left lane closures Sundays through Thursdays from 9 p.m. to 5 a.m.

• US 1 (Baltimore Avenue) between Contee Road and Muirkirk Road ICC Construction – Single lane closures on each direction of US 1 from 12 midnight until 12 noon Sunday.

While SHA and its partners work hard to maintain safe traffic mobility in work zones, each driver needs to actively modify his or her driving style to help prevent crashes. Stay alert – look for reduced speed limits, narrow driving lanes and highway workers. Slow down and don't follow too closely. Safer Driving. Safer Work Zones. For everyone!
 
###​​

###