MDOT SHA MAJOR PLANNED MAJOR WEEKEND LANE CLOSURE UPDATE (11/10/2017 – 11/13/2017)

MDOT SHA Logo

MDOT SHA Logo

For A listing of ALL Major MDOT SHA Projects spring through fall, click here for e-Road Ready 2017, an interactive map of major MDOT SHA projects.
***New traffic pattern in Easton, Talbot County:  Left turning signal added to the existing traffic signal at the US 50 (Ocean Gateway)/MD 565 (Landing Neck Road) intersection.***

Major Weekend Lane Closures

Anne Arundel County

• US 50 on the Severn River Bridge – Lane widening project – Single lane closures Sundays through Thursday between 7 p.m. and 5 a.m.

Baltimore/Howard County
 
• Northbound I-95 between US 1 and the Baltimore City/County line – Bridge deck improvements – Double lane closures Sundays through Thursday between 9 p.m. and 5 a.m.

Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks – Urban reconstruction project – Single lane closures with a flagging operation Saturday between 7 a.m. and 5 p.m.

Frederick County

• Eastbound I-70 at US 15 (Catoctin Mountain Highway) – Bridge deck repairs – Single lane closures Sunday nights through Friday mornings between 9 a.m. and 5 a.m.

Howard County

• Northbound MD 32 between US 29 (Columbia Pike) and MD 108 (Clarksville Pike) – Resurfacing – Single lane closure Mondays through Saturdays between 7 a.m. and 3 p.m. new work times (HIGH IMPACT)

Montgomery County
 
• Outer loop of I-495 (Capital Beltway) at southbound I-270 and southbound I-270 spur to the outer loop of I-495 - Resurfacing and pavement marking - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. through late-fall.

• Outer loop of I-495 (Capital Beltway) at the approaches to the American Legion Bridge over the Potomac River – Bridge approach resurfacing - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. through early-December.  New

• MD 190 (River Road) between Seven Locks Road and Carderock Springs Road - Private/commercial water utility work - Single and double lane closures Sunday nights through Friday mornings between 8 p.m. and 5 a.m.

• MD 193 (University Boulevard) between I-495 (Capital Beltway) and MD 320 (Piney Branch Road) – Resurfacing - Single and double lane closures Sundays through Friday mornings between 9 p.m. and 5 a.m., as well as Mondays through Fridays between 9 a.m. and 3 p.m.

• MD 650 (New Hampshire Avenue) between MD 108 (Ashton Road) and Tucker Lane – Resurfacing - Single lane closures guided by a flagging operation Sunday night through Friday mornings between 8 p.m. and 5 a.m. new – approximately one week of paving remaining.

• MD 118 (Germantown Road) Bridge over I-270 – Routine bridge inspection - Single lane closures on I-270 Saturday, between 4 a.m. and 12 noon new

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue) -  WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Weekend lane closures are possible between 9 a.m. and 9 p.m.

• Southbound US 29 (Colesville Road) at Spring Street - Private/commercial construction - Single and double lane closures on Saturday, November 4, 11 and 18th between 9 a.m. and 5 p.m.
 
Prince George’s County
 
• Temple Hill Road Bridge over I-95/I-495 (Capital Beltway) – Bridge deck repairs - Single, double and triple left lane closures on I-95/I-495 and single lane closures on Temple Hill Road -Sunday nights through Friday mornings between 8 p.m. and 5 a.m. through late-November.

• Southbound MD 210 (Indian Head Highway) at Old Fort Road - Private/commercial waterline work - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. through late-October.

• Westbound US 50 (Hansen Highway) between the Anne Arundel County Line and Lottsford Vista Road - Resurfacing - Single lane closures between 10 a.m. and 10 p.m., through late-fall.

• US 1 (Baltimore Avenue) between Hollywood Road and Lackawanna Street - Private/commercial water utility work - Single and double lane closures Sunday nights through Friday mornings between 9 p.m. to 5 a.m. through late-fall.

Long-Term Closures

Baltimore County

• MD 147 (Harford Road) at Glen Arm Road/Mt. Vista Road – Roundabout construction –Glen Arm Road is closed and detoured. New information - Glen Arm Road is open to traffic. Mt. Vista Road is temporarily closed and detoured for the next two weeks to complete concrete work.

Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks – Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m. until project completion, fall 2019/winter 2020.

Charles County

• MD 234 (Budds Creek Road) Bridge over Gilbert Swamp Run – Bridge replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  

• MD 6 (Charles Street) Bridge over Zekiah Swamp – Bridge deck replacement – Single lane closure guided by a temporary traffic signal until spring 2018.  

A look ahead at next week

Anne Arundel County

• Southbound MD 3 (Crain Highway) (Median) between Waugh Chapel Road and MD 175 (Millersville Road) (BGE project) – BGE electric transmission line project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.

Baltimore County

• Southbound MD 129 (Park Heights Avenue) between MD 133 (Old Court Road) and Baltimore City line (BGE project) – BGE Gas line replacement project – Single lane closures Mondays through Fridays between 9 a.m. until 3 p.m.

• I-83 (Baltimore-Harrisburg Expressway) at MD 137 (Mt. Carmel Road) – Bridge replacement project - Single lane and shoulder closures Mondays through Fridays between 9 a.m. and 3 p.m.

Caroline/Queen Anne’s/Talbot counties

• MD 404 (Queen Anne Highway/Shore Highway) between US 50 (Ocean Gateway) and MD 309 (Starr Road) and MD 480 (Ridgely Road) and the Denton Bypass – Highway widening – Single lane closures with flagging operations possible in each direction of MD 404 12 noon Mondays until 12 noon Fridays. For an updated list of lane closures on this project, click here.

Howard County

• Northbound I-95 ramp to northbound I-895 – Sound wall construction – Ramp to be closed and detoured Sundays through Friday mornings between 9 p.m. and 5 a.m. until Late-December.
 
Montgomery County
 
• Inner and outer loops I-495 (Capital Beltway) between MD 97 (Georgia Avenue) and MD 185 (Connecticut Avenue) - Roadway grinding and lane striping for Seminary Road Bridge Replacement Project - Single left lane closures Sunday nights through Friday mornings for approximately two weeks.
 
Washington County

• I-81 at the MD 63/MD 68 Bridge – Highway and bridge widening – Road closure and detour using the on and off ramps at MD 63/MD 68 Sunday nights through Friday mornings between 9 p.m. and 5 a.m. MD 63/MD 68 to be flagged to keep mainline I-81 traffic moving.

• Westbound I-70 auxiliary lanes over I-81 – Bridge deck replacement – Aux lanes closed with local detours – Wednesday night until Saturday morning between 8 p.m. and 5:30 a.m. new

 

###