MDOT SHA MAJOR PLANNED MAJOR WEEKEND LANE CLOSURE UPDATE (03/16/18 – 03/19/18)

MDOT SHA Logo

MDOT SHA Logo

Major Weekend Lane Closures

Anne Arundel County

• US 50 on the Severn River Bridge Lane widening project – Single lane closures 7 days a week – Single lane closures 7 p.m. and 5 a.m. (double lanes 11 p.m. until 5 a.m.) On-target for completion by Memorial Day.

• Inner loop of I-695 at the Curtis Creek Drawbridge Drawbridge repair (MDTA project) Inner loop I-695 closed and traffic in two-way operation using the outer loop of I-695 until November 2018.

Cecil County

• MD 272 Bridge over Amtrak Rails – Bridge replacement project/Steel Beam Setting – Single lane closures and brief total closures Friday night to Saturday morning and Saturday night to Sunday morning. Single lanes closures beginning at 9 p.m. and total closures (15-20 minutes) at approximately 12 midnight. All lanes to open each morning by 5 a.m. new

Montgomery County

• High-Impact - I-495 (Capital Beltway) between MD 97 and MD 185 Seminary Road Bridge Rehabilitation project/bridge beam setting - Single, double and brief TOTAL closures (at 11 p.m.) closures beginning Tuesday until late-March. Work will take place Sunday nights through Saturday mornings from 9 p.m. until 5 a.m. Friday nights added

• Southbound MD 191 (Bradley Boulevard) at Rayburn Avenue WSSC commercial water line resurfacing work - Single and double lane closures Saturday between 9 a.m. and 3 p.m.
 
• MD 355 (Wisconsin Avenue) between Waverly Street and Willow Lane (at 7272 Wisconsin Avenue) - Private /commercial demolition/construction project - Intermittent southbound lane closures with sidewalk closures Mondays through Fridays between 9 a.m. and 3 p.m. and/or Sunday nights to Friday mornings between 9 p.m. and 5 a.m.

• US 29 (Colesville Road) between I-495 (Capital Beltway) and MD 97 (Georgia Avenue)WSSC water line replacement project - Single and double lane closures Mondays through Fridays between 9:30 a.m. to 3:30 p.m. and Sundays through Friday mornings between 9 p.m. and 5 a.m. Single lane closures Saturday between 9 a.m. and 5 p.m. through the end of February.

Prince George’s County

• High-Impact - Northbound I-95 (outer loop of I-495) Bridge over Glenarden Parkway Bridge deck maintenance - Single, double and triple lane (at 11 p.m.) closures beginning Sunday until late-March. Work will take place Sunday nights through Friday mornings from 9 p.m. until 5 a.m.
 
Long-Term Closures

Carroll County

• MD 30 Business (Main Street) between North Woods Trail and the CSX Railroad tracks Urban reconstruction project – Single lane closures with a flagging operation Mondays through Saturdays between 7 a.m. and 8 p.m. until project completion, fall 2019/winter 2020.
 
Charles County
 
MD 234 (Budds Creek Road) Bridge over Gilbert Swamp RunBridge replacement –Single lane closure guided by a temporary traffic signal until spring.
 
MD 6 (Charles Street) Bridge over Zekiah Swamp – Bridge deck replacement – Single lane closure guided by a temporary traffic signal until spring.
 
MAJOR Closures for Next Week

Montgomery County
 
• High-Impact - I-495 (Capital Beltway) between MD 97 and MD 185 Seminary Road Bridge Rehabilitation project/bridge beam setting - Single, double and brief TOTAL closures (at 11 p.m.) closures beginning Tuesday until late-March. Work will take place Sunday nights through Saturday mornings from 9 p.m. until 5 a.m. Friday nights added

 
Prince George’s County

• High-Impact - Northbound I-95 (outer loop of I-495) Bridge over Glenarden Parkway Bridge deck maintenance - Single, double and triple lane (at 11 p.m.) closures beginning Sunday until late-March. Work will take place Sunday nights through Friday mornings from 9 p.m. until 5 a.m.
 
• Northbound I-95 (outer loop of I-495) ramp to US 1 (Baltimore Avenue) – Private utility work (water line repair) – Single lane closures Monday through Friday between 9 a.m. and 3 p.m. through late spring.
 
Washington County

• I-81 between the Potomac River Bridge (West Virginia line) and MD 68/MD 63 (Lappans Road) Highway widening project – Single lane closures Sunday nights through Friday mornings between 9 p.m. and 5 a.m. There may be occasional, brief total closures to move equipment and material into place between 2 midnight and 4 a.m.
Worcester County

• MD 611 (Stephen Decatur Highway) between US 50 and MD 376 (Assateague Road)Resurfacing – Milling (removal of top layer of asphalt) – Mondays through Fridays between 7 a.m. until 7 p.m.
 
• US 113 (Worcester Highway) between Massey Branch Road and Five Mile Branch Road Highway widening (phase 3) – traffic switch onto new alignment and beginning of rehabilitation of existing alignment – Monday, March 19 between 7 a.m. until 3 p.m. new
 

 

###