      TAC (Tourist Area Corridor) signs are supplemental directional guides on selected public roads, providing clear navigation to Maryland's recreational facilities and cultural treasures. These include museums, visitor centers, and cultural exhibits that teach visitors and Maryland residents about the State’s rich culture and activities.
      The Maryland State Highway Administration (SHA), in partnership with the Maryland Department of Commerce, accepts applications to join the TAC Program. By working with attractions, the State provides motorists with guidance to a variety of locations to visit and experience. The revamped TAC signage program, established under Maryland House Bill HB1032, allows eligible attractions to develop a signage plan with their engineering consulting firm and install the signage through their contractor.
 
       The TAC signage program consists of three phases: application, design, and construction. Please refer to the information below for further instructions on each phase.
 
 Application Phase
					Applications will be accepted beginning October 1st, 2024. Interested attractions may begin the process by downloading and reviewing the TAC brochure.
      
		
			
				
				
					Application Process
					Last updated: October 2025
 
					
						
							
								
								
								30 minutes
								Complete Application
							 
						   
						      
							
								
								
								Ten business days after receipt of the application fee.
								Verify Application
							 
						   
						  
							
								
								
								6 months
								Application Determination
							 
						   
					 
				 
			 
		 
	  
       Design Phase
 
       After your application is approved, please coordinate with your engineering consulting firm and refer to the below information to prepare the signage plan.
With the applicant’s eligibility approval, SHA will provide the locations of existing TAC signs near the attraction.
Attractions and/or their engineering firm may wish to review the existing TAC signs for their signage plan. SHA encourages the modification of existing TAC signs where feasible and appropriate as determined on a case-by-case basis, which will be reviewed at the time the signage plan is submitted.
 
      
      
      
 
      
      
 
       Construction Phase 
       After your signage plan is approved, please coordinate with your contractor and refer to the below information to start signage installation.
 
       
      
      
 
      
         
 
            FAQ
  
      
      
      
      
      Additional Information 
 
       
      Contact Information 
      
       
TAC Coordinator
MDOT State Highway Administration 
      
Office of Communications 
      
7491 Connelley Drive 
      
Hanover, MD 21076 
      
         [email protected]
Phone: (410) 787-4027 or Toll-Free: 1 (888) 963-0307