MDOT SHA PLANNED MAJOR LANE CLOSURE UPDATE FOR THE WEEKEND OF OCTOBER 23, 2020

MDOT SHA Logo

MDOT SHA Logo

Real-Time travel conditions and live traffic cameras are available - md511.maryland.gov.

This Weekend       

Baltimore County     

  • US 40 (Pulaski Hwy.) Dual Bridges over the Gunpowder Falls and the Little Gunpowder Falls (Baltimore/Harford Co. Line) - Bridge rehabilitation - Single lane closures on US 40 East and West at any time between 7 a.m. and 3 p.m. Saturday.                

Frederick County

  •  MD 28 (Dickerson Road) Bridge over the Monocacy River – Bridge rehabilitation– Total bridge closure scheduled every weekend starting Fridays at 10 p.m. and ending Mondays at 5 a.m. through fall except on holiday weekends. Single lane closure with a flagging operation Monday through Friday from 8 a.m. to 4 p.m. Open this weekend      

Week Ahead          

Anne Arundel County        

  • I-97 in both directions between MD 3 and MD 174 – Pavement repairs – Lane shifts 9 p.m. to 5 a.m., Sunday through Thursday nights; single lane closures 9 a.m. to 3 p.m. Monday through Friday.           

Baltimore County      

  • I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road –Dual Bridge replacement and interchange improvements – Detours of Padonia Rd. underneath I-83 possible on any weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning.  
  • MD 588 (Golden Ring Rd.) from MD 7 (Philadelphia Rd.) to Brookwood Avenue - Highway Maintenance roadway patching - Overnight single lane closures on MD 588 between the hours of 9 p.m. and 5 a.m. the next day, Sunday through Thursday, through early October.   
  • MD 26 (Liberty Road) from Deer Park Road to Owings Mills Boulevard – Highway Maintenance roadway pavement patching – Single lane closures between 9 a.m. and 3 p.m. Monday through Friday, through mid-December. New  

Carroll County          

  • MD 91 (Gamber Road/Emory Road) between Bloom Road and the Carroll/Baltimore County line – Patching and resurfacing – Single lane closures with a flagging operation from 8 p.m. to 5 a.m. Sunday night through Friday morning. This project is expected to be complete this fall. 
  • MD 140 (Baltimore Boulevard) between Club House Road and MD 91 (Gamber Road/Emory Road) - Curb and Gutter – Single lane closures Monday through Friday from 9 a.m. to 3 p.m. MD 140/MD 91 intersection may have flagging depending on traffic. New       

Frederick County            

  • Southbound I-270 between CSX railroad bridge and MD 80 (Fingerboard Road) - Patching – Single lane closures from 7 p.m. to 4 a.m. Sunday nights through Friday mornings. This project is expected to be complete in November. New

Garrett County

  • I-68 Westbound at Exit 22 – Extended lane closure for construction through November. No left turn will be permitted from I-68 Exit 22 onto US 219 South/Chestnut Ridge Road.  Detour in place to navigate drivers to US 219 South/Chestnut Ridge Road. Portable sign, directional signs and barrels will guide drivers through detour. New

Harford County    

  • US 40 (Philadelphia Blvd) from MD 132 to MD 22 - Highway Maintenance roadway pavement patching - Single lane closures on US 40 East and West overnight between 9 p.m. and 5 a.m. the next day, Sunday through Thursday nights through late November.  
  • MD 439 (Old York Rd.) from Baltimore County Line to MD 23 (East-West Highway) – Highway Maintenance roadway pavement patching – Single lane closures between 9 p.m. and 3 p.m.  Monday through Friday through mid-December.  New

Montgomery County          

  • Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE  (MTA project).                       
  • Outer loop of I-495 (Capital Beltway) between MD 650 (New Hampshire Avenue) and MD 193 (University Boulevard). - Bridge joint repair - Intermittent off-peak single and multiple lane closures, overnight, Monday through Thursday, 9 p.m. to 5 a.m. and weekends from 9 p.m. Friday continuously through 5 a.m. Monday morning through year-end 2020.  Updated         
  • MD 547 (Strathmore Avenue) from MD 355 (Rockville Pike) to Connecticut Avenue (MD 185).  Utility excavation and installation.  Eastbound right shoulder closures, 9 a.m. to 3 p.m., Monday to Friday through late fall 2020. New             

Prince George’s County              

  • Forest Drive/Columbian Way crossover at MD 3 (Crain Highway) in Bowie – Roadway, stormwater management work – Crews closed the Forest Drive/Columbian Way crossover at MD 3 through the fall. Motorists will be directed to the northern crossover at Sylvan Drive.                    

Long-Term Closures           

 

Anne Arundel County              

  • MD 2 between MD 270 (Furnace Branch Road) and I-695 (Baltimore Beltway) – Nighttime single lane closures – Resurfacing – 8 p.m. to 5 a.m.                 
  • MD 450 (West Street) between MD 2 and Taylor Avenue – Single lane closures – Utility work – 9 a.m. to 3 p.m.      
    • MD 2 between MD 253 (Mayo Road) and Tarragon Lane – Utility work - daytime single lane closures, Monday through Friday, 9 a.m. to 3 p.m.                       
  • MD 175 Annapolis Road/Jessup Road) Westbound between National Business Parkway and MD 295 (Baltimore-Washington Parkway) – Utility relocation – Single lane closures Sunday nights through Friday mornings from 7 p.m. to 5 a.m.                          
  • MD 424 between Duke of Kent Drive and MD 450 (Defense Highway) - Improvement project – Single lane closures between 9 a.m. and 3 p.m., weekdays.                 

Baltimore City          

  • HIGH IMPACT  I-895 (Baltimore Harbor Tunnel Throughway) between the tunnels and Boston Street/O’Donnell Street (exit 11) and the Holabird Avenue exit (MDTA Project) – Bridge rehabilitation project – The southbound bore of the Baltimore Harbor Tunnel (I-895) will be closed continuously until mid-June.                      

Baltimore County          

  • I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road  – Dual Bridge replacement and interchange improvements – I-83 South and North both have a split traffic pattern at Padonia Rd. interchange with all lanes open (two left, one right) until late fall 2020 (South) and spring 2021 (North).  I-83 North and South may have single lane closures between 9 a.m. and 4 p.m. Monday-Friday and between 7 p.m. and 5 a.m. the next day Sunday-Thursday.  24 hours/7 days single lane closure on Padonia Rd. East until project is complete. Notes: Interchange Ramp from Padonia Road East to I-83 North closed 24 hours/7 days until project is complete.  Single lane closures on Padonia Rd. West between 9 a.m. and 3 p.m. Monday-Saturday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday.  Detours of Padonia Rd. underneath I-83 possible on any weeknights (Sunday-Thursday) between 8 p.m. and 5 a.m. the next morning.                          
  • Cove Road bridge over I-695 - Bridge deck replacement - On I-695, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day. On Cove Road, daytime single lane closures in both directions Monday-Friday between 9 a.m. and 3 p.m. and overnight lane closures Sunday-Thursday between 7 p.m. and 5 a.m. the next day Sunday-Thursday.          
  • MD 695A (Broening Hwy.) between Maryland Ave. and east of Ralls Ave. at Baltimore City/County Line - Roadway Resurfacing and Safety Improvements – Daytime single lane closures on MD 695A North and South between 9 a.m. and 3 p.m. Monday – Thursday and between 9 a.m. and 2 p.m. Friday.  Overnight double lane closures with traffic lane shifts on MD 695A between 8 p.m. and 5 a.m. the next day Sunday-Thursday.            
  • MD 151/Wharf Road (MD 151 B) Interchange – Three-bridge replacement project –  24-hour / 7-day single lane closures on both northbound and southbound MD 151 within the interchange through late October.          
  • MD 150 (Eastern Ave.) between the bridge over Back River and the intersection with Mace Ave./Riverside Dr. - Baltimore County Water main replacement and MDOT SHA highway resurfacing – Single lane closures on eastbound and MD 150 between 9 a.m. and 3 p.m., Monday-Friday, and between 7 p.m. and 5 a.m. the next day, Sunday-Thursday.                      
  • MD 140 (Reisterstown Rd.) Northbound between Garrison View Rd. and Painters Mill Rd. – Highway Widening and Resurfacing - Single and double lane closures along northbound MD 140 Sunday-Thursday between 9 p.m. and 5 a.m. the next morning. Occasional single lane closures Monday-Friday for a two-hour time period between the hours of 9 a.m. and 3 p.m.                   
  • MD 140 (Reisterstown Rd.) between Painters Mill Rd. and E. Pleasant Hill Rd. – Resurfacing/County Water Main replacement – Single lane closures with lane shifts along northbound and southbound MD 140 from Painters Mill Road to E. Pleasant Hill Road. Crews are installing new 36-inch water main from Owings Mills Blvd. to E. Pleasant Hill Rd. Daytime single lane closures Monday-Friday between 9 a.m. and 3 p.m.  Night time single lane closures Sunday-Thursday between 8 p.m. and 6 a.m. the next day.  Access to all driveways in this section will be maintained during the lane closures.                 
  • MD 45 (York Road) between north of Padonia Road and Wight Avenue – Roadway Resurfacing/County Water Main replacement – Single and double lane closures on MD 45 for night paving work between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane closures where needed between 9 a.m. and 3 p.m. Monday-Friday.            
  • MD 43 (White Marsh Blvd.) at Honeygo Blvd. – Intersection Widening and Improvements – Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, between 7 a.m. and 1 p.m.            

Calvert County          

  • MD 261 between 8th Avenue and Beach Avenue – Extended road closure for construction through early 2021.       
  • MD 2/4 between Fox Run Boulevard and Stoakley Road – Overnight single lane closures Sunday through Thursday nights, 9 p.m. to 5 a.m.        

Cecil County          

  • MD 273 (Telegraph Road) Bridge over Big Elk Creek – Bridge replacement project – Temporary traffic signal to alternate traffic in single lane through fall 2020. Updated   
  • MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction) through summer 2021. This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279.  Updated           

Charles County          

  • MD 6 (Charles Street) between US 301 and Willow Lane – Resurfacing – Nighttime single lane closures between 10 p.m. and 5 a.m., Sunday through Thursday nights.       
  • Southbound US 301 between MD 6 and Glen Albin Road – Lane shift; restricted access at median crossovers.           

Frederick County          

  • MD 28 (Dickerson Road) Bridge over the Monocacy River – Bridge rehabilitation – Total bridge closure scheduled every weekend starting Fridays at 10 p.m. and ending Mondays at 5 a.m. through fall except on holiday weekends. Single lane closure with a flagging operation Monday through Friday from 8 a.m. to 4 p.m. Open this weekend           

Harford County 

  • Old Joppa Road Bridge over I-95 (MDTA project)  – Bridge replacement project – Old Joppa Road closed and locally detoured.        
  • Clayton Road bridge over I-95 between MD 152 and MD 24 (MDTA project) – Clayton Road closed and detoured until early 2022.  New
    • MD 22 (Churchville Road) between MD 136 (Calvary Road) and Prospect Mill Road  – Roadway resurfacing and intersection widening – Single lane closures/lane shifts on MD 22 east and west of Thomas Run Road/Shucks Road intersection between 9 a.m. and 3 p.m. Monday-Friday, and between 8 p.m. and 5 a.m. the next day Sunday-Thursday and between 7 a.m. and 1 p.m. Saturdays when necessary.                       
  • MD 132 (West Bel Air Ave.) between US 40 (Philadelphia Blvd./Pulaski Hwy.) and MD 462 (Paradise Ave.) – Roadway resurfacing and traffic signal – Occasional single lane and shoulder/parking lane closures on MD 132 between 9 p.m. and 5 a.m. the next day Sunday-Thursday and single lane and shoulder/parking lane closures when needed between 7 a.m. and 4 p.m. Monday-Friday.                 
  • MD 924 South (Kenmore Avenue) between US 1 and Main Street, and MD 924 (Emmorton Road) between Ring Factory Road and Plumtree Road - Roadway resurfacing - Single lane and shoulder closures along both segments of MD 924 (Kenmore Avenue) 9 a.m. to 3 p.m. Monday-Friday, and overnight 8 p.m. to  5 a.m. the next morning Sunday-Thursday nights.                              

Montgomery County                  

  • US 29 (Colesville Road) from St. Andrews Way to Stewart Lane. -Safety and resurfacing project - Single daytime lane closures, weekdays, 9 a.m. to 3 p.m. and double overnight lane closures, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.                     
  • MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. - Relocation project.- Intermittent single northbound and southbound lane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2021.                       
  • MD 190 (River Road) from MD 188 (Wilson Lane) to MD 614 (Goldsboro Road). Roadway improvement project. Single lane closures, weekdays, 9 a.m. to 3 p.m. and multiple lane closures, overnight, 9 p.m. to 5 a.m. through late spring 2021.                 
  • MD 355 (Frederick Road) at West Old Baltimore Road- Intersection construction project - Intermittent single lane closures on both roads, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through year-end 2020
  • I-270 (Eisenhower Highway) from Watkins Mill Road to Great Seneca Creek Crossing –  Interchange construction project. Intermittent northbound lane closures, weekdays, 5 a.m. to 2 p.m. and southbound 10 a.m. to 7 p.m. and overnight northbound and southbound lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. through fall 2020.                    
  • I-270 (Eisenhower Highway) from Interstate 70 to I-495 (Capital Beltway). - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through late spring 2021.                        
  • Seminary Road from Hale Street to MD 192 (Forest Glen Road) –  Bridge rehabilitation project – Intermittent left and right single northbound and southbound lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 8 p.m. to 5 a.m. through year-end 2020.                  
  • Inner and Outer Loop of I-495 (Capital Beltway) from MD 97 (Georgia Avenue) to MD 185 (Connecticut Avenue). Bridge rehabilitation project. Intermittent single weekday single lane closures, 9 a.m. to 3 p.m. and intermittent overnight single double and triple lane closures and full traffic stops, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2020.          

Prince George’s County          

  • US 1 (Baltimore Avenue) College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project – Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. to 7 a.m. starting June 6th through summer 2023.                    
  • US 1 from Oak Street to the Howard County Line – Resurfacing – Northbound and southbound double lane closures 7 a.m. to 5 p.m. Monday through Friday. The 1.2-mile project is expected to be complete by fall. Updated                 
  • Kerby Hill Road/Livingston Road intersections at MD 210 (Indian Head Highway) – Interchange construction project – Crossover from Kerby Hill Rd. to Livingston Rd. across MD 210 to close and be detoured. Click here for detour routes. Crews construction bridge that will connect the roads and will be complete by the end of 2021.                    
  • Southbound I-95/I-495 (Capital Beltway) ramp to eastbound MD 214 (Central Avenue) – Bridge replacement project – Total ramp closure with traffic using the Capital Beltway/MD 202 (Largo Road) interchange and then to MD 214 via MD 202.                   

St. Mary’s County          

  • Southbound MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) – Daytime single lane closures between 9 a.m. and 3 p.m.                       
  • MD 6 south of Parlett Morgan Road - Emergency closure, traffic detour in place.                

Washington County          

  • I-70 East and Westbound at the MD 65 Interchange  –  Bridge rehabilitation and widening – Alternating east and westbound lane closures. Work continues daily between 7:00 a.m.-6:00 p.m. Monday-Thursday night work will be done from 6 p.m.to 5 a.m. This will be continuous throughout the project.                 
  • I-70 (Dwight D. Eisenhower Highway) between MD 65 (Sharpsburg Pike) and Antietam Creek – Barrier wall installation – The left shoulders of I-70 in both directions will be closed through November.                         
  • I-70 East and Westbound at MD 56 (Big Pool) - Bridge deck replacement and rehabilitation for the bridge over I-70 - Left and right shoulder closure.            
      

 

###