PLANNED MAJOR LANE CLOSURE UPDATE FOR WEEKEND OF JULY 22, 2022

MDOT SHA Logo

MDOT SHA Logo

​All Work is Weather Dependent

Real-Time travel conditions and live traffic cameras md511.maryland.gov

Weekend

Baltimore County/Harford County line                                

US 40 Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Single-lane closures possible on US 40 in the vicinity of the four bridges on Saturdays through summer 2022.  Eastbound US 40: 7 a.m.  to 4 p.m. Westbound US 40: 8 a.m. to 4 p.m.                 
     

Baltimore County       

I-70 from Baltimore City Line to I-695 – Concrete Pavement Resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday – Friday 9 a.m. to 3 p.m. and continuously on weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, work will continue until early 2023.  
 

Dorchester County  

MD 14 East and West between MD 313 (Eldorado-Sharptown Rd) and MD 331 (Rhodesdale-Vienna Rd) - Bridge rehabilitation.  Total bridge closure with detour, 24 hours until 3 p.m. August 8 NEW  

Week Ahead

Anne Arundel County     

Southbound MD 2 Resurfacing between Cypress Creek Road and US 50 - Nighttime single lane closures between 10 p.m. and 5 a.m., Sunday through Thursday nights.   NEW     
    

Baltimore County                                

  
US 40 (Pulaski Highway) Westbound from Campbell Boulevard to MD 700 (Martin Boulevard) – Roadway milling and resurfacing - Weekday single lane closures between 9 a.m. and 3 p.m. and overnight between 8 p.m. and 5 a.m. Sunday – Thursday through mid-summer.           
  
I-695 (Baltimore Beltway) from I-70 to US 40 (Baltimore National Pike) and from MD 144 (Frederick Rd.) to MD 372 (Wilkens Ave.) - Roadway patching and resurfacing – Overnight single and double lane closures Sunday – Thursday between 8 p.m. and 5 a.m. the next morning.  Overnight ramp closures and detours possible Sunday – Thursday 10 p.m. - 8 a.m. the next morning. Updated                   
               

Baltimore/Howard County line 

I-95 northbound bridge over Patapsco River - Bridge work - Single lane closure expected Monday, July 25, 9 a.m. to 3 p.m. New ​

Carroll County                         

MD 140 (Taneytown Pike) at Mayberry Road - Roadway widening project - Mayberry Road is closed between MD 140 and MD 832 (Old Taneytown Pike) through Thursday, September 1. Detour uses MD 832.   
    
MD 97 (New Washington Road) between MD 140 (Baltimore Boulevard) and the Fenby Park & Ride, south of MD 32 (Sykesville Road) - Highway patching and resurfacing project – Single lane closure and flagging operation overnight from 8 p.m. to 5 a.m. Sunday through Thursday. Only paving work remains. The project is expected to be complete this month.       
                   
MD 27 (Ridge Road) between Waterville Road and Gillis Falls Road – Highway patching project – Flagging operation overnight Sunday through Thursday from 7 p.m. to 6 a.m.  Only paving work remains. The project is expected to be complete this month.            
                     

Dorchester County                          

  
US 50 East and West near Linkwood – Utility Work.  Double lane and shoulder closures weekdays 8 a.m. - 5 p.m. through December 29 NEW 

US 50 at Woods Rd and Chesapeake Dr – Utility work.  Double lane and shoulder closures with flagging operations weekdays 7 a.m. - 5 p.m. through September 1 NEW 

US 50 East and West at MD 750 (Old Rt. 50) and Bucktown Rd -  Traffic signal modifications.  Double lane and shoulder closures weekdays 9 a.m. - 3 p.m. through September 30 NEW 

MD 14 West between MD 16 (Mt. Holly Rd) and Poplar St – Utility work.  Double lane and shoulder closures weekdays 8 a.m. - 4 p.m. through August 12  

US 50 East and West between Bramble St and Woods Rd. – Milling, patching, paving and marking operation.  Four lanes west and three lanes east with shoulder closures Monday-Thursday 6:30 a.m. – 7 p.m. through September 1    

MD 341 North and South between Robbins Farm and MD 16 (Church Creek Rd) - Utility work.  Single lane and shoulder closures weekdays 8 a.m. - 4 p.m. through August 4    

US 50 East and West between Woods Road and MD 16 (Church Creek Road) - Utility Work. Lane and shoulder closures weekdays 7 a.m. - 5 p.m. through July 29.              
                         
Frederick County                             
  
MD 144 (East Patrick Street) between East Street and Quinn Orchard Road – Roadway improvements – Single-lane closures and a flagging operation in place weekdays, 9 a.m. to 3 p.m., through expected completion this month.           
          
MD 180 (Jefferson Pike) between Lander Road/Holter Road and the Mount Zion Road traffic circle – Highway patching and resurfacing project – Eastbound lane is complete. Single lane closure and flagging operation Monday through Friday from 9 a.m. to 3 p.m. This project is expected to be complete this month.       
            

Harford County                                         

MD 136 (Whiteford Road) from Robinson Mill Road to Heaps Road – Highway Maintenance pavement milling patching and resurfacing – Overnight lane closures and flagging operations between 8 p.m. and 5 a.m., Sunday – Thursday through mid-summer 2022.                               
         

Howard County                       

Westbound I-70 between westbound US 40 (Baltimore National Pike) merge ramp and MD 97 (Hoods Mill Road) - Highway patching and resurfacing project – Single lane closure and exit ramp detours at MD 32 and MD 97 when crews are working in that area. The schedule is overnight from Sunday evening to Friday morning from 8 p.m. to 5 a.m. This project is expected to be complete this month.              
                     
MD 108 (Clarksville Pike) between MD 32 (Patuxent Freeway) and the Howard/Montgomery Co line, past Wainwright Road – Highway patching and resurfacing project – Single lane closure and flagging operation Sunday night through Friday morning from 8 p.m. to 5 a.m. The project is expected to be complete this month.          
            

Montgomery & Prince George’s Counties                                                 

Purple Line – For a list of active construction and lane closures along the Purple Line alignment, please click HERE​ (MTA project).              
                              

St. Mary’s County                        

MD 5 between Abell/Moakley Streets and MD 245 (Hollywood Road) - Single and/or double lane closures, Sunday through Thursday nights, 8 p.m. to 5 a.m. for storm drain installation.                          
            
MD 5 between Camp Brown Road and Scotland Beach Road – Weekday daytime single lane closures between dawn and 4 p.m. for resurfacing along northbound MD 5.                       
            

Wicomico County                       

US 13 North and South between MD 54 (E State St) and Stockyard Rd – Maintenance work.  Double lane and shoulder closures Monday – Thursday 7 a.m. - 4 p.m. through August 19 NEW 

US 50 East and West between Naylor Mill Rd and US 50 (Salisbury Bypass) - Maintenance.  Double lane and shoulder closures Monday – Thursday 7 a.m. - 4 p.m. through August 19 NEW
 
US 13 North between E Carroll St and E Main St – Utility work.  Double lane and shoulder closures weekdays 7 a.m. - 5 p.m. through August 12 NEW 

US 13 North Ramp from US 13/US 50 North to US 50 West – Bridge repair.  Double lane, shoulder and ramp closures weekdays 7 a.m. - 5 p.m. through July 29 NEW   
  
US 50 East Ramp from US 50 West to US 13/US 50 North - Bridge repair.  Double lane, shoulder and ramp closures weekdays 7 a.m. - 5 p.m. through July 29 NEW   
  
US 50 East from Bent Pine Rd to Worcester County Line – Bridge repair.  Double lane and shoulder closures weekdays 7 a.m. - 5:30 p.m. through July 31 UPDATED   
  
US 50 East and West at various locations.  Landscape maintenance.  Double lane and shoulder closures weekdays 7 a.m. - 4 p.m. through September 1     

US 13 North and South at various locations.  Landscape maintenance.  Double lane and shoulder closures weekdays 7 a.m. - 4 p.m. through September 1      
  
US 13 North between E Carroll St and E Main St. - Utility work.  Double lane closures weekdays 6:30 a.m. - 4 p.m. through July 29     
  
US 13 North and South between E. Main St and S. Dulany Ave – Utility work.  Double lane and shoulder closures weekdays 8 a.m. - 6 p.m. through July 29     
                          

Worcester County                           

MD 528 South from 55th to 49th St – Construction.  Three lane and shoulder closures Monday – Thursday 7 a.m. - 5 p.m. through July 28 NEW 

MD 376 East and West from US 113 (Worcester Hwy) to Flower St. - Construction.  Double lane and shoulder closures weekdays 6 a.m. - 7 p.m. through August 26 UPDATED  
 
US 12 North and South between Brantley Rd and Bunting Rd – Utility work. Double lane and shoulder closures weekday 7 a.m. - 5 p.m. through September 1  

US 50 East and West between MD 346 (Old Ocean City Rd) and Jerry Mack Rd - Utility work. Double lane and shoulder closures weekday 7 a.m. - 5 p.m. through September 1  

US 113 North and South between US 13 (Ocean Highway) and MD 575G (Kepler Ln) - Utility work. Double lane and shoulder closures weekday 7 a.m. - 5 p.m. through September 1   

MD 528 North and South at 94th St – Routine maintenance. 3 lane and shoulder closures Monday-Thursday 7 a.m. - 3 p.m. through July 29 UPDATED     

US 113 North between MD 376 (Bay St) and Branch St.- Utility work.  Double lane and shoulder closures weekdays 7 a.m. - 6 p.m. through July 29             

Long-Term Closures

Allegany County                            


MD 51 (Industrial Blvd) from Mechanic Street (MD 51) to Virginia Avenue – Crews will work Sunday – Thursday, 7:00 p.m. to 7:00 a.m., Patching, milling and paving on MD 51 from Mechanic Street to Virginia Avenue – Various flagging operations and lane closures will be in place both north and southbound.  Updated  
  
MD 51 (Oldtown Road) Bridge over the C&O Canal – Crews will be closing both lanes and creating a single lane in the center of the roadway.  This traffic set up will include a temporary traffic signal alternating traffic through the single lane.  Weather permitting, the project is expected to be completed by the end of summer.                     
  
I-68 (National Freeway) to Street Road - Crews will be patching, milling and paving.  There will be a left lane closure westbound.  Signage, barrels and cones will be in place.  Work times will vary between night work and daytime work. Weather permitting, this project is expected to be completed by November.  NEW     

MD 36 (Georges Creek Road SW) at the Bridge over George’s Creek – Bridge Cleaning and Painting – 7 a.m. to 5 p.m. Right shoulder closures both directions.            

MD 36 (Georges Creek Road SW) at the Bridge over Potomac Hollow Road SW – Bridge Cleaning and Painting – for day and night work. Right shoulder closures both directions.       
                                                 

Anne Arundel County                      

MD 424 between MD 214 and US 50 – Daytime single lane closures between 9 a.m. and 3 p.m. for resurfacing.          
         
MD 648 between MD 3 and I-97 – Nighttime single lane closures between 9 p.m. and 5 a.m. for pavement resurfacing, Sunday through Thursday.               
            
MD 424 between Lang Drive and the Crofton High School entrance – Daytime lane shift between 9 a.m. and 2 p.m., Monday through Friday for maintenance work.                
               

Baltimore County                                          


I-695 TSMO Project: Outer loop from I-83 NB (BHX) to Old Court Road – ITS Underground Installation and Roadway construction –Right Shoulder Closures for ITS construction and Roadway Construction by contractor team along outer loop I-695 from I-83 NB to Old Court Road, Monday 7/25 to Friday 7/29 between 9 a.m. and 3 p.m.   

I-695 TSMO Project: I-695 Inner/Outer loop from US 40 (National Pike) to I-95 – Test Pits and Pipe Investigation –Intermittent Right/Left Shoulder Closures for test pits and pipe investigation by contractor team along inner/outer loop I-695 from US 40 to I-95, Monday 7/25 to Friday 7/29 between 9 a.m. and 3 p.m.   

I-695 TSMO Project: I-695 Outer loop from MD 139 (Charles St.) to Greenspring Ave – Traffic lane re-marking for work zone lane shift – Double Lane Closures for traffic shift by contractor team along outer loop I-695 from Charles St. to Greenspring Ave. Sunday 7/24 to Thursday 07/28/2022 overnight between 10 p.m. and 5 a.m.  

I-695 TSMO Project: I-83 SB from W. Timonium Rd to I-695 OL –  Traffic lane re-marking for work zone lane shift – Right Lane Closures for traffic shift by contractor team along I-83 SB (BHX) from Timonium Rd to I-695 Outer Loop, Sunday 7/24 to Thursday 7/28 overnight between 10 p.m. and 5 a.m. 

Raphael Road overpass of I-95 (JFK Memorial Expy.) - MDTA Reconstruction Project – MDTA closed the Raphael Road overpass as part of the I-95 Express Toll Lanes (ETL) Northbound Extension project. The closure will be in place through early 2023 and traffic is being detoured to the Bradshaw Road overpass.   

CSX Transportation rail bridge over I-695 North (Inner Loop side) – Bridge abutment rehabilitation – Detour note: Hollins Ferry Road ramp to I-695 Inner Loop is closed for bridge work 24/7 until August 2022.  

I-70 Westbound from I-695 to Patapsco River/Howard Co. Line – Asphalt Pavement Resurfacing and Safety Improvements – Single and double lane closures on westbound I-70 daytime Monday – Friday 9 a.m. to 3 p.m. and overnight Sunday – Thursday 7 p.m. to 5 a.m. the next day, through early 2023.  There will also be temporary overnight interchange ramp closures and detours for paving work Sunday – Thursday nights beginning week of July 24. Updated        
   
I-70 Westbound and Eastbound from Baltimore City Line to I-695 – Concrete Pavement Resurfacing – Single and double lane closures on I-70 east of I-695 weekdays Monday – Friday 9 a.m. to 3 p.m. and continuously on weekends for concrete pour and cure from 9 p.m. Friday through 5 a.m. Sundays, until early 2023.       
   
I-83 (Baltimore-Harrisburg Expressway) North and South Bridges over Padonia Road – Dual Bridge replacement and interchange improvements – Ramp from eastbound Padonia Road to northbound I-83, along with the new left-turn bay is now open to traffic.  Project is substantially complete. There may be occasional single lane closures on I-83 and Padonia Road overnight through late July.      

US 40 (Pulaski Highway) Dual Bridges over Little Gunpowder Falls and (Big) Gunpowder Falls -Bridge rehabilitation – Traffic Pattern Change: There is a traffic split in place on both the US 40 eastbound and westbound bridges over Little Gunpowder Falls which, will be in effect through late fall 2022.  Construction work will proceed on all four bridges through spring 2023, with ongoing temporary single lane closures on eastbound and westbound US 40 in the vicinity of the bridges during the following off-peak times:  Daytime (Monday – Saturday) Westbound US 40: 8 a.m. to 4 p.m.  Eastbound US 40: 7 a.m.  to 4 p.m.  Overnight (Sunday – Thursday) Westbound and Eastbound US 40:  7 p.m. to 5 a.m. the next day. Possible Traffic Impact in Harford County. Updated                   
    
I-695 Bridge over US 40 (Baltimore National Pike) - Bridge support structure rehabilitation – Crews are working on repairs to bridge piers and abutments with long-term traffic shifts and temporary lane closures on US 40 eastbound and westbound underneath I-695 in Catonsville through late summer 2022.          
 
US 1 (Washington Blvd.) Bridge over CSX Transportation rail lines – Bridge replacement –  Clarke Blvd. at US 1 is closed/detoured 24 hours/7 days through early 2023.  Posted detour route includes Selford Rd., Francis Ave., Oregon and Carville Aves., Tom Day Blvd. and US 1 Alt. (Southwestern Blvd.)  In summer and fall 2022 there will be temporary single lane closures with flagging operations  on US 1 in the vicinity of the bridge when necessary on weekdays between 9 a.m. and 3 p.m. Overall project completion summer 2023. Updated    
                 
MD 25 (Falls Road) between Baltimore City / County Line and I-695 – Baltimore County DPWT water line replacement project - Overnight lane closures with flagging operations along sections of Falls Road, 9 p.m. - 5 a.m. the next day Sunday – Thursday, with some daytime work as needed 9 a.m. - 3 p.m. through spring 2024.                 
   
MD 26 (Liberty Road) between Brenbrook Drive and N. Rolling Road - ADA Sidewalk Reconstruction/Upgrades - Temporary overnight single lane closures on MD 26 between 9 p.m. and 5 a.m. the next day Sunday - Thursday and now between 9 a.m. and 12:30 p.m. Monday - Thursday through summer 2022. Updated                        
                  
MD 30 (Hanover Pike) at Mt. Gilead Road – Intersection Improvements –Daytime lane closures with flagging operations at intersection Monday through Friday, now 9 a.m. – 12:30 p.m.  Updated                   
  
MD 43 (White Marsh Blvd.) at Honeygo Blvd. - Intersection Widening and Improvements - Temporary daytime lane closures on MD 43 and Honeygo Blvd. legs of the intersection between 9 a.m. and 3 p.m. Monday-Friday, and overnight lane closures at any time between 8 p.m. and 5 a.m. the next day Sunday-Thursday. When necessary, there will be temporary lane closures on weekends, 7 a.m. - 1 p.m. Saturday and/or Sunday through late summer 2022.                      
                            
MD 140 (Reisterstown Road) between I-695 and Mt. Wilson Lane/ Grey Rock Rd. with MD 140 at Hooks Lane- Americans with Disabilities Act (ADA) improvements - includes traffic signal upgrades, crosswalk markings, and paving on MD 140 and also on Hooks Lane at MD 140. Temporary daytime single lane closures on MD 140 between 9 a.m. and 3 p.m. Monday – Friday and overnight single lane closures on Hooks Lane approach to MD 140 between 9 p.m. and 5 a.m. the next morning Sunday – Thursday through summer 2022.  Updated                               
  
MD 140 (Reisterstown Rd.) between E. Pleasant Hill Rd. and Stocksdale Ave. –Resurfacing/County Water Main replacement - Daytime single lane closures Monday - Friday 9 a.m. - 3 p.m. between E. Pleasant Hill Rd and Stocksdale Ave.  Nighttime single lane closures within project limits Sunday – Thursday nights between 8 p.m. and 6 a.m. the next day. Access to driveways in this section will be maintained during any lane closures.  Project scheduled through summer 2024.                                              
  
MD 147 (Harford Road) / Joppa Road - Intersection Improvements - Daytime single lane closures and flagging operations on Harford and Joppa Road in the vicinity of the intersection Monday – Thursday 9 a.m. - 4 p.m. Monday – Thursday and 9 a.m. - 3 p.m.  Fridays.  Overnight work with lane closures Sunday – Thursday 9 p.m. - 5 a.m. the next day. Lane shift in effect on eastbound Joppa Road approaching Harford Road summer 2022, with work zone barriers on right side of the street. Construction through fall 2022. Updated                
               
MD 151 (Sparrows Point Blvd.) / Wharf Road (MD 151 B) Interchange - Three-bridge replacement project at interchange.  One side of the existing MD 151 bridge is closed, and two-way traffic runs on the other side of the bridge (one lane in each direction). This will be in effect through 2022 and will enable traffic on MD 151 while the existing bridge over Wharf Road is removed and replaced in stages.  Southbound and northbound Wharf Road are closed/detoured at the interchange for replacement of two more bridges. Construction scheduled through summer 2024.            
                     

Cecil County                                                                          


MD 213 (Augustine Herman Highway) bridge over C&D Canal in Chesapeake City – U.S. Army Corps of Engineers bridge repair project. Occasional single lane closures and flagging will occur 9 a.m. to 3 p.m., Monday-Thursday from May 9 through August 11. View real-time traffic conditions at the bridge with these cameras: MD 213 at Basil Ave. (south side) and MD 213 at Lock St. (north side).         
                      
MD 279 (Elkton Road) at MD 277 (Fletchwood Road) – Northbound MD 279 is reduced to a single lane at the MD 277 intersection near the Delaware line and shifted across the median to a contraflow pattern (one lane in each direction).  This is part of the Delaware Department of Transportation (DelDot) reconstruction of route 279.                      
               

Frederick County                                                  


Northbound US 15 Bridge over MD 77 – Bridge Deck replacement project – The right lane is closed. Each side of the bridge is expected to take six to eight months to finish. The entire project is expected to be complete by spring 2023.                                  
            

Garrett County                      

MD 39 (Hutton Road) from Ashby Ellis to US 219 in Oakland – Drainage improvement and repaving project, flagging operation, 7 a.m. - 5 p.m. Monday-Friday          
  
I-68 (National Freeway) westbound to MD 42 – Left lane closures in both directions to allow for median work.  Work is expected to be completed by the end of August, weather dependent. NEW  
             

Harford County                                                              


Old Joppa Road Bridge over I-95 (MDTA project) – Bridge replacement project – Old Joppa Road closed and locally detoured.                                                                  

Clayton Road bridge over I-95 between MD 152 and MD 24 (MDTA project) - Clayton Road closed and detoured until early 2022.                                  

I-95/MD 152 Interchange Reconstruction (MDTA project) - Travel lanes on MD 152 at I-95 will be shifted to accommodate reconstruction of the existing interchange. MD 152 traffic will shift from the current location to the outside of the roadway in both directions on MD 152 between Old Mountain Road/Jaycee Drive and MD 7 (Philadelphia Road). All access to and from I-95 will retain its present configuration throughout this phase of construction, which will last through spring 2022.                       
               

Montgomery County                                        


I-270 southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project - Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through late summer 2022, Possible Traffic Impact in Frederick County                      

MD 97 (Georgia Avenue) from north of Gold Mine Road to south of Holiday Drive. MD 97 relocation project. Intermittent off-peak single and multiple ane closures, weekdays, 8 a.m. to 4 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through year-end 2022. 

Brookeville Road from MD 97 (Georgia Avenue) to Grayheaven Manor Road. Sewer relocation project. Full 24/7 road closure with detour through late fall 2022. Drivers should add extra commute time and use MD 97 and MD 108 as alternate routes. 

 Brighton Dam Road near MD 97 (Georgia Avenue). MD 97 relocation project excavation and new road resurfacing work. Off-road activity with an intermittent off-peak flagging operation and single lane closures, Sunday through Saturday from sunrise to sunset through year-end 2022. 

MD 185 (Connecticut Avenue) at Jones Bridge Road/Kensington Parkway Intersection improvement project - Single off-peak lane closures on MD 185, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. and single off-peak lane closures on Jones Bridge Road, weekdays, 9 a.m. to 3 p.m. and overnight, 7 days per week, 9 p.m. to 5 a.m. through late summer 2023.             

MD 185 (Connecticut Avenue) at Saul Road Intersection improvement project. Single lane closures with intermittent intersection closures, weekdays, 9 a.m. to 3 p.m. through year-end 2022.            

I-270 from I-70 to I-495 (Capital Beltway) - Traffic congestion relief construction project - Intermittent single lane closures, weekdays, 10 a.m. to 3 p.m. and single, double and triple overnight lane closures, Sunday through Thursday, 7 p.m. to 5 a.m. and intermittent temporary ramp closures with detours up to 24 hours a day through year-end 2022.               

I-270 southbound from MD 121 (Clarksburg Road) to MD 109 (Old Hundred Road) - I-270 acceleration lane expansion project. Single and multiple off-peak lane closures, weekdays 9:30 a.m.to 3:30 p.m. and overnight, Sunday through Thursday, 7 p.m. to 4 a.m. through year-end 2022.                                                                  
               

Prince George’s County                                                 


Cherry Hill Road over I-95 northbound ramp at the I-495 Outer Loop(Capital Beltway). Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 a.m. through late fall 2022.        
        
US 1 (Baltimore Avenue) College Ave. to MD 193 (University Boulevard) - US 1 Reconstruction Project - Corridor Improvement- Northbound and southbound single lane closures throughout the length of the project Saturday through Sunday, 10 a.m. to 4 p.m. and 9 p.m. tm. through late summer 2023.       
  
US 1 (Baltimore Avenue) from Rhode Island Avenue to MD 212A (Powder Mill Road). Safety and resurfacing project. Off peak single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. through late summer 2023.   
   
US 1 (Rhode Island Avenue) from Charles Armentrout Drive to Farragut Street. Rhode Island Avenue Trolley Trail project. Single and multiple off-peak lane closures, weekdays, 9 a.m. to 3 p.m. through  year-end 2023.   
      
Westbound MD 4 (Pennsylvania Avenue) ramp to northbound MD 980D (Ritchie Marlboro Road). Slope repair project. Full ramp closure with detour through year-end 2022. Drivers should consider MD 223 (Woodyard Road) and Old Marlboro Pike as alternate routes.        
                                                    
MD 5 (Branch Avenue) from the DC Line to the intersection of Curtis Drive - Safety and resurfacing project. Intermittent/temporary single and multiple MD 5 northbound off-peak lane closures, weekdays, 9 a.m. to 3 p.m., overnight, Sunday through Thursday 7 p.m. to 5 a.m. and weekends, 5 a.m. to 10 p.m. and weekends 5 a.m. to 10 p.m. Intermittent/temporary single  and multiple MD 5 southbound off-peak lane closures weekdays, 6 a.m. to 12 noon overnight, Sunday through Thursday, 7 p.m. to 6 a.m. and intermittent/temporary single and multiple    MD 637 single lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.                 
               
MD 5 (Branch Avenue) from Suitland Parkway to Curtis Drive. Median construction. Single northbound lane closure 24 hours a day through late summer 2022.              
         
MD 210 at Livingston Road/Kerby Hill Road. Interchange construction project. Intermittent   off-peak single and multiple lane closures, Monday through Saturday, 9 a.m.to 3 p.m. and overnight, Sunday through Thursday, 8 p.m.to 5 a.m. through late summer 2022.                                                               
          
MD 212A (Powder Mill Road) from Pine Street to US 1 (Baltimore Avenue) - Roadway reconstruction project. Intermittent single and multiple lane closures weekdays, 8 a.m. to 4 p.m. through late summer 2022.                
              
MD 223 (Woodyard Road) from Sherwood Drive to Victoria Drive - Sidewalk construction project - Off-peak lane closures, weekdays, 8:30 a.m. to 3:30 p.m. and Saturdays, 8 a.m. to 5 p.m. through late fall 2022.               
                        
MD 223 (Woodyard Road) at Dower House Road - Geometric improvement project - Single weekday lane closures, 9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through late summer 2022.              
                                                      
MD  500 (Queens Chapel Road) from Eastern Avenue to MD 208 (Hamilton Street) Community safety and enhancement project. Intermittent single and multiple lane closures weekdays,9 a.m. to 3 p.m. and overnight, Sunday through Thursday, 7 p.m. to 6 a.m. through late summer 2022.                   
                    
I-95/I-495 (Capital Beltway) from Suitland Road to MD 4 (Pennsylvania Avenue) - Suitland Parkway bridge replacement project. Road shoulder closure permissible 24 hours daily, intermittent single and multiple lane closures, weekdays, 9 a.m. to 3 p.m. and overnight, Sunday through Friday, 8 p.m. to 6 a.m. through year end 2022.       
   
US 1 (Baltimore Avenue) over I-495 (Capital Beltway) - Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 .am. through year-end  2022.   
    
US 50 westbound ramp over MD 295 (Baltimore-Washington Parkway) - Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5 .am. through year-end 2022.    
    
I-95 northbound over I-495 (Capital Beltway), Outer Loop. Bridge painting and cleaning project. Single and multiple off-peak lane closures; 8 p.m. to 5.am. through year-end 2022.           
           

Talbot County                                            


MD 33 (Talbot St.) from Spencer Ave. to Lee St. in St. Michaels - Sidewalk project. Occasional single-lane closures and flagging 9 a.m. to 3 p.m. Monday-Thursday through spring 2023.    
    
MD 329 (Royal Oak Rd.) from MD 33 to MD 33 - Resurfacing all 3.3 miles of MD 329 from June 21 through July 15.  This work will be split into three segments with a full closure and detour of each segment during construction.  Detour signs will be posted.  Work hours are 7 a.m. to 6 p.m., Monday-Thursday.  Local access will be maintained.  NEW    
                                                                            

Washington County           

  
US 40 at Day Road near Hagerstown –  Intersection Safety Improvement project - Crews will have left lanes and the crossover closed in both directions of US 40 at Day Road from 9:00 a.m. to 3:00 p.m. Mondays through Fridays NEW  
          
I-70 East and Westbound at the MD 65 Interchange – Bridge rehabilitation and widening of I-70 bridges over MD 65 - Through September, motorists on I-70 eastbound/westbound will follow a posted detour.  I-70 eastbound/westbound shifted to the median and the right shoulder is closed with concrete barrier wall.                     
  
US 40 Westbound only from Nottingham Road to MD 144 – Crews will be patching, milling and paving.  Expect right and left shoulder closures, nightly lane closures from 8 p.m. to 5 a.m. Sunday – Thursday  NEW   ​



###